Doors are UltraRugged, UltraReliable, UltraAffordable. Albany Door Systems - A Company of Albany International Corp. All Rights Reserved 1080 Maritime
Rev. 9/27/2010 Manual #001450 Page 10 Place the second side frame on the wall and attach the width gauge to the two side frames. Using the same pro
Rev. 9/27/2010 Manual #001450 Page 11 Install light curtain using the pre-drilled holes. Space the light curtain off the frame using the supplied
Rev. 9/27/2010 Manual #001450 Page 12 Align the point of the mounting plate with the existing hole in the side frame. TOP ROLL DO NOT REMOVE THE P
Rev. 9/27/2010 Manual #001450 Page 13 By hand, start all three of the M10 barrel fastening screws into the bearing plate. Next, tighten the bearin
Rev. 9/27/2010 Manual #001450 Page 14 This section applies only to the R version. Release the brake to allow the motor torque arm to swing to pos
Rev. 9/27/2010 Manual #001450 Page 15 COUNTERBALANCE This section applies only to the standard and XL version. Attach the counterbalance belts t
Rev. 9/27/2010 Manual #001450 Page 16 COUNTERBALANCE This section applies only to the R version. Connect barrel and belt shaft via roller chai
Rev. 9/27/2010 Manual #001450 Page 17 Run the counterbalance belts through the upper spring attachment bracket. With the door in the open position
Rev. 9/27/2010 Manual #001450 Page 18 Bottom Lift Strap Assembly Attach the lift belt to Adapter 4 by wrapping the lift belt under the adapter and
Rev. 9/27/2010 Manual #001450 Page 19 BRAKE RELEASE CABLE ROUTING Proper operation of the brake release will allow for the outer sheath to push dow
Rev. 9/27/2010 Manual #001450 Page 2 INTRODUCTION The contents of this manual are designed to help you install UltraSecure 3000 high speed doors.
Rev. 9/27/2010 Manual #001450 Page 20 SIDE FRAME COVERS Install the cover gussets using the appropriate slots located in the side frame (Standard
Rev. 9/27/2010 Manual #001450 Page 21 Install the side frame spring box covers with the provided hardware. Front mounted light curtains (if applica
Rev. 9/27/2010 Manual #001450 Page 22 FULL ROLL AND MOTOR COVERS These instructions pertain to the Standard and XL versions only. Install the sid
Rev. 9/27/2010 Manual #001450 Page 23 Using the hardware provided install the motor cover back to the side plate (1). Next install the bot-tom cove
Rev. 9/27/2010 Manual #001450 Page 24 Instructions for Using Over-Travel Brake System. About the Over-Travel Brake System Your UltraSecure door is
Rev. 9/27/2010 Manual #001450 Page 25 Resetting the Brake To reset the brake, first loosen the clamp screws (Fig 3) so that you can move the yoke u
Rev. 9/27/2010 Manual #001450 Page 26 Electrical Operation Instructions When the over-travel mechanism has been engaged, the power to the control s
Rev. 9/27/2010 Manual #001450 Page 27 ELECTRICAL CONNECTIONS -A- Motor/Brake—3/4” Conduit (all doors) -B- Low Voltage Signals—3/4” Conduit (all
Rev. 9/27/2010 Manual #001450 Page 28 MOTOR WIRING DRILL ONLY INTO BOTTOM OF BOXUSE MINIMUM ¾” CONDUIT¾”LOW VOLTAGE CONDUITENCODER, SAFETY, ACTIVAT
Rev. 9/27/2010 Manual #001450 Page 29 HMANUALACTIVATORS13456MODULE - ACONNECT AS “NORMALLY OPEN”2TB2REMOTE CONTROL13456MODULE - A2TB2MODULE - DLOOP
Rev. 9/27/2010 Manual #001450 Page 3 WALL ANCHORING GUIDE Albany Door Systems does not supply hardware for mounting the door to the wall. Use prop
Rev. 9/27/2010 Manual #001450 Page 30
Rev. 9/27/2010 Manual #001450 Page 31
Rev. 9/27/2010 Manual #001450 Page 32
Rev. 9/27/2010 Manual #001450 Page 33
Rev. 9/27/2010 Manual #001450 Page 34 ENABLING THE WIRELESS SAFETY SYSTEM If the door is equipped with Albany’s Wireless Safety System (indicated b
Rev. 9/27/2010 Manual #001450 Page 35 UltraSmart™ STARTUP PROCEDURE Albany’s UltraSmart™ control system is designed to accommodate numerous option
Rev. 9/27/2010 Manual #001450 Page 36
Rev. 9/27/2010 Manual #001450 Page 37 Installation Checklist Please fill out below and return to Albany Door Systems Customer Installatio
Rev. 9/27/2010 Manual #001450 Page 38 Electrical Installation Yes No Were the factory supplied cables (motor, encoder & 7-wire) long
Rev. 9/27/2010 Manual #001450 Page 39 Door Start-Up Yes No Was the door start-up procedure easy to follow? If No, what pro
Rev. 9/27/2010 Manual #001450 Page 4 INSTALLATION REFERENCE MARKS – 3000R Measure from the inside of the left door jamb to the inside of the righ
Rev. 9/27/2010 Manual #001450 Page 40 Please email digital pictures of the installed door to: [email protected] Activation Yes No What
Rev. 9/27/2010 Manual #001450 Page 5 INSTALLATION REFERENCE MARKS – 3000STD Measure from the inside of the left door jamb to the inside of the ri
Rev. 9/27/2010 Manual #001450 Page 6 INSTALLATION REFERENCE MARKS – 3000XL Measure from the inside of the left door jamb to the inside of the rig
Rev. 9/27/2010 Manual #001450 Page 7 Delivery and Inspection Lock-Out Tag-out all electrical power supplied to the door before making any electrica
Rev. 9/27/2010 Manual #001450 Page 8 PREPARATION FOR DOOR ASSEMBLY Prior to door installation, the door opening must be examined to insure the exis
Rev. 9/27/2010 Manual #001450 Page 9 SIDE FRAME AND WIDTH GAUGE If the door opening declines or slopes from side to side 1st attach the side frame
Comments to this Manuals